AIXX EXCHANGE
Inspection Report
Inspection Report 9418-1050-9405
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 9418-1050-9405 was issued by AIXX Exchange on 2026-09-25 for B300 NVL8 Server. Verification method: On-site Acceptance. Result: A+ · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU module verification | PASS | 100% | |
| CPU model x count verification | PASS | 100% | |
| Memory population x capacity | PASS | 100% | |
| SSD / boot device verification | PASS | 100% | |
| DPU / NIC verification | PASS | 100% | |
| PSU redundancy verification | PASS | 100% | |
| System assembly & cooling inspection | PASS | 100% | |
| Serial number cross-check (chassis/modules/packaging) | PASS | 25/25 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Opened for inspection only, then repacked |
| Pressure test | NOT_EXECUTED | 0% | |
| SN GCH**6W | PASS | 1 | |
| SN VS0**MY | PASS | 1 | |
| SN TJ1**ZN | PASS | 1 | |
| SN 6TA**LS | PASS | 1 | |
| SN 4FY**VE | PASS | 1 | |
| SN LKP**86 | PASS | 1 | |
| SN DDS**0S | PASS | 1 | |
| SN LT6**L2 | PASS | 1 | |
| SN 8PP**70 | PASS | 1 | |
| SN Q41**AX | PASS | 1 | |
| SN 7FV**29 | PASS | 1 | |
| SN 2WV**1S | PASS | 1 | |
| SN 4KC**5A | PASS | 1 | |
| SN LWD**N8 | PASS | 1 | |
| SN 64L**7H | PASS | 1 | |
| SN CEA**FE | PASS | 1 | |
| SN WEZ**W8 | PASS | 1 | |
| SN 127**AD | PASS | 1 | |
| SN G8F**LA | PASS | 1 | |
| SN H4Z**DK | PASS | 1 | |
| SN LMV**Y5 | PASS | 1 | |
| SN 095**YM | PASS | 1 | |
| SN LUQ**X0 | PASS | 1 | |
| SN 3F0**CT | PASS | 1 | |
| SN FVJ**M0 | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese