AIXX EXCHANGE
Inspection Report
Inspection Report 9091-5039-3966
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 9091-5039-3966 was issued by AIXX Exchange on 2026-10-09 for B300 NVL8 Server. Verification method: On-site Acceptance. Result: A+ · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU module verification | PASS | 100% | |
| CPU model x count verification | PASS | 100% | |
| Memory population x capacity | PASS | 100% | |
| SSD / boot device verification | PASS | 100% | |
| DPU / NIC verification | PASS | 100% | |
| PSU redundancy verification | PASS | 100% | |
| System assembly & cooling inspection | PASS | 100% | |
| Serial number cross-check (chassis/modules/packaging) | PASS | 28/28 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Opened for inspection only, then repacked |
| Pressure test | NOT_EXECUTED | 0% | |
| SN B8R**ML | PASS | 1 | |
| SN QD5**6E | PASS | 1 | |
| SN 05A**FJ | PASS | 1 | |
| SN ESZ**3Z | PASS | 1 | |
| SN G01**WK | PASS | 1 | |
| SN ZCP**HD | PASS | 1 | |
| SN XLJ**GS | PASS | 1 | |
| SN XEX**9R | PASS | 1 | |
| SN XHX**RV | PASS | 1 | |
| SN 7NK**8W | PASS | 1 | |
| SN NC7**T1 | PASS | 1 | |
| SN 4GQ**QN | PASS | 1 | |
| SN 1D3**JZ | PASS | 1 | |
| SN EPL**U4 | PASS | 1 | |
| SN 8CN**SL | PASS | 1 | |
| SN XT5**DQ | PASS | 1 | |
| SN 3MX**P1 | PASS | 1 | |
| SN DKY**02 | PASS | 1 | |
| SN 8MD**8L | PASS | 1 | |
| SN 35U**Z9 | PASS | 1 | |
| SN XBJ**MP | PASS | 1 | |
| SN RTA**40 | PASS | 1 | |
| SN 48H**M6 | PASS | 1 | |
| SN XZR**ZD | PASS | 1 | |
| SN YY2**0T | PASS | 1 | |
| SN TTY**Y8 | PASS | 1 | |
| SN 1K8**21 | PASS | 1 | |
| SN 38U**FM | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese