Inspection Report
Inspection Report 8791-8113-1946
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 8791-8113-1946 was issued by AIXX Exchange on 2026-10-01 for B300 NVL8 Server. Verification method: On-site Acceptance. Result: S- · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU module verification | PASS | 100% | |
| CPU model x count verification | PASS | 100% | |
| Memory population x capacity | PASS | 100% | |
| SSD / boot device verification | PASS | 100% | |
| DPU / NIC verification | PASS | 100% | |
| PSU redundancy verification | PASS | 100% | |
| System assembly & cooling inspection | PASS | 100% | |
| Serial number cross-check (chassis/modules/packaging) | PASS | 24/24 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Wooden crate, original cartons inside |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN RNS**85 | PASS | 1 | |
| SN EU5**SF | PASS | 1 | |
| SN AU3**X3 | PASS | 1 | |
| SN HE5**N3 | PASS | 1 | |
| SN SSK**TN | PASS | 1 | |
| SN 1GJ**P1 | PASS | 1 | |
| SN QGS**SD | PASS | 1 | |
| SN A7R**FA | PASS | 1 | |
| SN J5U**X3 | PASS | 1 | |
| SN QBM**W2 | PASS | 1 | |
| SN J60**FP | PASS | 1 | |
| SN 6KG**US | PASS | 1 | |
| SN H7W**W0 | PASS | 1 | |
| SN ER6**4F | PASS | 1 | |
| SN BKY**BD | PASS | 1 | |
| SN V24**F3 | PASS | 1 | |
| SN 55Z**YJ | PASS | 1 | |
| SN 7WC**60 | PASS | 1 | |
| SN 4RU**TG | PASS | 1 | |
| SN 0NV**KD | PASS | 1 | |
| SN FSX**U7 | PASS | 1 | |
| SN DR0**PV | PASS | 1 | |
| SN 58M**9W | PASS | 1 | |
| SN QBB**Y7 | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.