AIXX EXCHANGE
Inspection Report
Inspection Report 8530-1842-4980
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 8530-1842-4980 was issued by AIXX Exchange on 2026-10-25 for RTX PRO 6000 Blackwell 8-GPU Server. Verification method: On-site Acceptance. Result: A · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU SKU & memory | PASS | 100% | |
| NVLink / fabric | PASS | 100% | |
| Serial / SN consistency | PASS | 29/29 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Wooden crate, original cartons inside |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN XG********** | PASS | 1 | |
| SN YG********** | PASS | 1 | |
| SN AH********** | PASS | 1 | |
| SN V6********** | PASS | 1 | |
| SN N7********** | PASS | 1 | |
| SN GU********** | PASS | 1 | |
| SN 85********** | PASS | 1 | |
| SN LK********** | PASS | 1 | |
| SN RZ********** | PASS | 1 | |
| SN CT********** | PASS | 1 | |
| SN 4W********** | PASS | 1 | |
| SN 39********** | PASS | 1 | |
| SN UC********** | PASS | 1 | |
| SN WU********** | PASS | 1 | |
| SN 9X********** | PASS | 1 | |
| SN PK********** | PASS | 1 | |
| SN ZC********** | PASS | 1 | |
| SN 74********** | PASS | 1 | |
| SN DM********** | PASS | 1 | |
| SN LI********** | PASS | 1 | |
| SN PB********** | PASS | 1 | |
| SN QF********** | PASS | 1 | |
| SN 3M********** | PASS | 1 | |
| SN UM********** | PASS | 1 | |
| SN RR********** | PASS | 1 | |
| SN B4********** | PASS | 1 | |
| SN I0********** | PASS | 1 | |
| SN 8U********** | PASS | 1 | |
| SN PP********** | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese