AIXX EXCHANGE
Inspection Report

Inspection Report 7801-2783-2821

⬇ Download PDF Report ✓ Verify This Report ← Back to Supply Hall
Report No.7801-2783-2821
SubjectLiquid Cooling CDU
RegionUnited States
GradeS-
InspectorJason Lee · AIXX-US-09
Issuing OrganizationAIXX Exchange
ReviewerMarcus Reed · AIXX-US-03
MethodOn-site Acceptance
Verified On2026-09-08
StatusValid

Summary

On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 7801-2783-2821 was issued by AIXX Exchange on 2026-09-08 for Liquid Cooling CDU. Verification method: On-site Acceptance. Result: S- · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.

Configuration

Coolingliquid loop CDU
Accepted currenciesUSD

Checklist

Coolant flow rate calibrationPASS100%
Supply / return water temperaturePASS100%
Cooling capacity rating checkPASS100%
Sealing & leak testPASS100%
Serial / SN consistencyPASS9/9
Cosmetic & accessoriesPASS100%
Firmware & diagnosticsPASS100%
Thermal visual inspectionPASS100%
Packaging & sealingPASS100%Original factory carton, seals intact
SN X********CPASS1
SN U********XPASS1
SN 2********MPASS1
SN 3********GPASS1
SN 2********RPASS1
SN V********LPASS1
SN G********5PASS1
SN M********TPASS1
SN T********CPASS1

Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese