AIXX EXCHANGE
Inspection Report

Inspection Report 7191-1578-7634

⬇ Download PDF Report ✓ Verify This Report ← Back to Supply Hall
Report No.7191-1578-7634
SubjectLiquid Cooling CDU
RegionJapan
GradeA+
Inspector小林 健 · AIXX-JP-09
Issuing OrganizationAIXX Exchange
Reviewer佐藤 亮 · AIXX-JP-03
MethodOn-site Acceptance
Verified On2026-08-27
StatusValid

Summary

On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 7191-1578-7634 was issued by AIXX Exchange on 2026-08-27 for Liquid Cooling CDU. Verification method: On-site Acceptance. Result: A+ · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.

Configuration

Coolingliquid loop CDU
Accepted currenciesJPY / Crypto (USDT)

Checklist

Coolant flow rate calibrationPASS100%
Supply / return water temperaturePASS100%
Cooling capacity rating checkPASS100%
Sealing & leak testPASS100%
Serial / SN consistencyPASS100%
Cosmetic & accessoriesPASS100%
Firmware & diagnosticsPASS100%
Thermal visual inspectionPASS100%

Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese