Summary
On-site verification completed. Configuration verified; serial check notes are itemized.
Summary
Report 4475-4502-3340 was issued by AIXX Exchange on 2026-09-22 for Quantum-2 X800. Verification method: On-site Acceptance. Result: A · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| Port mapping | PASS | 100% | |
| Optics & cables | PASS | 100% | |
| Serial / SN consistency | PASS | 16/16 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Throughput stress test | NOT_EXECUTED | 0% | Owner not permitted |
| Packaging & sealing | PASS | 100% | Manufacturer carton with tamper-evident seal |
| SN MTV*******I7 | PASS | 1 | |
| SN MTU********6F | PASS | 1 | |
| SN MTE********FI | PASS | 1 | |
| SN MTJ********ML | PASS | 1 | |
| SN MT6********LH | PASS | 1 | |
| SN MT9********51 | PASS | 1 | |
| SN MTB********BY | PASS | 1 | |
| SN MTV********0P | PASS | 1 | |
| SN MTD********EX | PASS | 1 | |
| SN MTF*******26 | PASS | 1 | |
| SN MTT*******ZZ | PASS | 1 | |
| SN MT0********I9 | PASS | 1 | |
| SN MTN*******82 | PASS | 1 | |
| SN MT4********W8 | PASS | 1 | |
| SN MTW*******P4 | REVIEW | 1 | Second verification visit being scheduled |
| SN MTU*******D1 | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.