AIXX EXCHANGE
Inspection Report
Inspection Report 4243-4351-9340
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 4243-4351-9340 was issued by AIXX Exchange on 2026-10-13 for B300 NVL8 Server. Verification method: On-site Acceptance. Result: S- · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU module verification | PASS | 100% | |
| CPU model x count verification | PASS | 100% | |
| Memory population x capacity | PASS | 100% | |
| SSD / boot device verification | PASS | 100% | |
| DPU / NIC verification | PASS | 100% | |
| PSU redundancy verification | PASS | 100% | |
| System assembly & cooling inspection | PASS | 100% | |
| Serial number cross-check (chassis/modules/packaging) | PASS | 23/23 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Opened for inspection only, then repacked |
| Pressure test | NOT_EXECUTED | 0% | |
| SN YC1**M4 | PASS | 1 | |
| SN BDR**PT | PASS | 1 | |
| SN DD5**75 | PASS | 1 | |
| SN UPQ**QR | PASS | 1 | |
| SN 2RZ**CF | PASS | 1 | |
| SN D08**HC | PASS | 1 | |
| SN C22**YG | PASS | 1 | |
| SN TTF**LH | PASS | 1 | |
| SN RLR**53 | PASS | 1 | |
| SN P6E**3C | PASS | 1 | |
| SN C1Z**W6 | PASS | 1 | |
| SN CYG**0A | PASS | 1 | |
| SN MMS**CX | PASS | 1 | |
| SN XXB**1G | PASS | 1 | |
| SN A8K**0N | PASS | 1 | |
| SN Z2M**H3 | PASS | 1 | |
| SN XJ5**TG | PASS | 1 | |
| SN YJC**KK | PASS | 1 | |
| SN EV5**Z3 | PASS | 1 | |
| SN PN1**MB | PASS | 1 | |
| SN CAT**NC | PASS | 1 | |
| SN UD1**3J | PASS | 1 | |
| SN TCK**U5 | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese