AIXX EXCHANGE
Inspection Report
Inspection Report 3343-7337-8095
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 3343-7337-8095 was issued by AIXX Exchange on 2026-11-17 for Quantum-2 X800. Verification method: On-site Acceptance. Result: B+ · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| Port mapping | PASS | 100% | |
| Optics & cables | PASS | 100% | |
| Serial / SN consistency | PASS | 18/18 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Throughput stress test | NOT_EXECUTED | 0% | |
| Packaging & sealing | PASS | 100% | Opened for inspection only, then repacked |
| SN MTG*******FI | PASS | 1 | |
| SN MTQ*******Z8 | PASS | 1 | |
| SN MT6********VG | PASS | 1 | |
| SN MTO********QO | PASS | 1 | |
| SN MTL*******WG | PASS | 1 | |
| SN MT3********K2 | PASS | 1 | |
| SN MTM********HZ | PASS | 1 | |
| SN MT0*******G8 | PASS | 1 | |
| SN MTI********HH | PASS | 1 | |
| SN MTT*******2I | PASS | 1 | |
| SN MTF********H0 | PASS | 1 | |
| SN MTR********8O | PASS | 1 | |
| SN MTY********FL | PASS | 1 | |
| SN MT8*******R8 | PASS | 1 | |
| SN MT8*******ZD | PASS | 1 | |
| SN MTH*******QY | PASS | 1 | |
| SN MTR********P8 | PASS | 1 | |
| SN MTY********M2 | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese