AIXX EXCHANGE
Inspection Report
Inspection Report 2208-1500-8814
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 2208-1500-8814 was issued by AIXX Exchange on 2026-10-21 for L40S 8-GPU Server. Verification method: On-site Acceptance. Result: S- · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU SKU & memory | PASS | 100% | |
| NVLink / fabric | PASS | 100% | |
| Serial / SN consistency | PASS | 27/27 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Wooden crate, original cartons inside |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN 55********** | PASS | 1 | |
| SN D0********** | PASS | 1 | |
| SN 0P********** | PASS | 1 | |
| SN 3N********** | PASS | 1 | |
| SN 0B********** | PASS | 1 | |
| SN C9********** | PASS | 1 | |
| SN R7********** | PASS | 1 | |
| SN W5********** | PASS | 1 | |
| SN 07********** | PASS | 1 | |
| SN Z0********** | PASS | 1 | |
| SN VG********** | PASS | 1 | |
| SN SM********** | PASS | 1 | |
| SN H9********** | PASS | 1 | |
| SN D8********** | PASS | 1 | |
| SN NG********** | PASS | 1 | |
| SN RB********** | PASS | 1 | |
| SN IW********** | PASS | 1 | |
| SN 0C********** | PASS | 1 | |
| SN 7F********** | PASS | 1 | |
| SN FH********** | PASS | 1 | |
| SN DC********** | PASS | 1 | |
| SN ZG********** | PASS | 1 | |
| SN 9J********** | PASS | 1 | |
| SN 2A********** | PASS | 1 | |
| SN RT********** | PASS | 1 | |
| SN JT********** | PASS | 1 | |
| SN ZF********** | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese