AIXX EXCHANGE
Inspection Report
Inspection Report 2007-0102-2309
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 2007-0102-2309 was issued by AIXX Exchange on 2026-10-29 for L40S 8-GPU Server. Verification method: On-site Acceptance. Result: A · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU SKU & memory | PASS | 100% | |
| NVLink / fabric | PASS | 100% | |
| Serial / SN consistency | PASS | 28/28 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Opened for inspection only, then repacked |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN MU********** | PASS | 1 | |
| SN E7********** | PASS | 1 | |
| SN 9H********** | PASS | 1 | |
| SN E1********** | PASS | 1 | |
| SN ZE********** | PASS | 1 | |
| SN G5********** | PASS | 1 | |
| SN HK********** | PASS | 1 | |
| SN TY********** | PASS | 1 | |
| SN VS********** | PASS | 1 | |
| SN EW********** | PASS | 1 | |
| SN DQ********** | PASS | 1 | |
| SN DJ********** | PASS | 1 | |
| SN T9********** | PASS | 1 | |
| SN SR********** | PASS | 1 | |
| SN HE********** | PASS | 1 | |
| SN 7T********** | PASS | 1 | |
| SN KO********** | PASS | 1 | |
| SN SO********** | PASS | 1 | |
| SN UN********** | PASS | 1 | |
| SN KX********** | PASS | 1 | |
| SN IS********** | PASS | 1 | |
| SN BJ********** | PASS | 1 | |
| SN 6R********** | PASS | 1 | |
| SN XO********** | PASS | 1 | |
| SN BL********** | PASS | 1 | |
| SN QQ********** | PASS | 1 | |
| SN T2********** | PASS | 1 | |
| SN P6********** | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese