AIXX EXCHANGE
Inspection Report

Inspection Report 1281-5290-9761

⬇ Download PDF Report ✓ Verify This Report ← Back to Supply Hall
Report No.1281-5290-9761
SubjectLiquid Cooling CDU
RegionUnited Arab Emirates
GradeS
InspectorLayla Mansour · AIXX-AE-08
Issuing OrganizationAIXX Exchange
ReviewerOmar Haddad · AIXX-AE-02
MethodOn-site Acceptance
Verified On2026-09-07
StatusValid

Summary

On-site verification completed. Configuration verified; serial check notes are itemized.
Summary
Report 1281-5290-9761 was issued by AIXX Exchange on 2026-09-07 for Liquid Cooling CDU. Verification method: On-site Acceptance. Result: S · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.

Configuration

OEM / BrandBoyd
Coolingliquid loop CDU

Checklist

Coolant flow rate calibrationPASS100%
Supply / return water temperaturePASS100%
Cooling capacity rating checkPASS100%
Sealing & leak testPASS100%
Serial / SN consistencyPASS20/20
Cosmetic & accessoriesPASS100%
Firmware & diagnosticsPASS100%
Thermal visual inspectionPASS100%
Packaging & sealingPASS100%Original factory carton, seals intact
SN NL**********PASS1
SN NR**********REVIEW1Second verification visit being scheduled
SN GS**********PASS1
SN KR**********PASS1
SN SB**********PASS1
SN TB**********PASS1
SN 9C**********PASS1
SN 3V**********PASS1
SN 25**********PASS1
SN 70**********PASS1
SN F1**********PASS1
SN A6**********PASS1
SN 36**********PASS1
SN 5K**********PASS1
SN ZQ**********PASS1
SN 3P**********PASS1
SN DV**********PASS1
SN KP**********PASS1
SN X8**********PASS1
SN 2Y**********PASS1

Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese